Water Jet Loom Operation Preparation

Oct 14, 2019

Leave a message

• The curtain must be installed on the left and right curtain guides.

• To prevent the guard shaft from falling off, be sure to attach the bracket using bolts.

• Be careful not to bring the side guards and curtains into contact with the steel shovel for proper installation.

• If the side guards and curtains are not properly installed, the side guard brackets will contact the steel shovel, causing the shield to fly out.

• When performing the loading and unloading operations of the curtain, the guard shaft and the guard plate, operate the machine while it is stopped.

WL680 HIGH SPEED RAPIER LOOM FOR JACQUARD